inspection

4 05, 2020

Routine Maintenance

By |2021-05-14T20:15:26+01:00May 4th, 2020|Control & Distribution, LV Switchgear, MV Switchgear, Oil & Gas, Site Services, Uncategorised|0 Comments

The importance of routine maintenance is clear to see in this photograph. A stalled motor caused an overload fault which was not cleared by the respective protection device. Subsequent investigation attributed complete failure of the motor and associated MCC cubicle to a failed motor overload device thus causing severe overheating and subsequent fire. The clients [...]

16 11, 2018

Beryl Bravo Platform – LV Modifications & Switchboard Maintenance

By |2019-04-23T16:16:32+01:00November 16th, 2018|Control & Distribution, LV Switchgear, MV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services Ltd have recently undertaken work on the Apache Beryl Bravo platform as part of the installations Delta V control system upgrade. This work involved the installation of control components and associated wiring modifications to a large quantity of LV MCC and MV cubicles to enable the platform remote operation of various drives. [...]

19 09, 2018

Delta Fire – Helideck Foam System CompEX electrical system

By |2019-04-23T16:09:09+01:00September 19th, 2018|Control & Distribution, Oil & Gas|0 Comments

LS Engineering Services Ltd have been working on a number of projects for Delta Fire , the most recent of which involved the procurement, installation, inspection and testing of a complete electrical system for a Heli Deck foam system container. The installation was required to be CompEX certified and therfore our Compex certified engineer was utilised. LS [...]

1 07, 2018

MV Motor Maintenance – UK Onshore Oil & Gas Plant

By |2018-08-28T14:21:15+01:00July 1st, 2018|Electric Motors, Oil & Gas, Repair / Overhaul, Site Services|0 Comments

LS Engineering Services Ltd site support team recently completed the overhaul of 3 MV Gas Compressor Motors for a major Onshore Oil and Gas plant in Southern England. These activities included detailed inspections and remedial work including the replacement of worn labyrinth seals.  

7 05, 2018

Laurence Scott & Electromotors Ltd Slendaur Upgrade – Singapore

By |2018-08-28T14:14:23+01:00May 7th, 2018|MV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services Ltd recently completed upgrade and maintenance work to two Laurence Scott & Electromotors Ltd Slendaur MV Motor starters for our client in Singapore. This work involved the replacement of two vacuum contactor's, fitting of replacement CT's and partial re-wire of the control circuit. The work was undertaken within the clients local workshop [...]

1 02, 2018

325VDC Ballast Pump Starter Cubicle Overhaul

By |2018-05-01T15:22:25+01:00February 1st, 2018|Defence, LV Switchgear, Repair / Overhaul|0 Comments

LS Engineering Services recently completed the overhaul of a number of 325VDC Ballast Pump Starter Cubicle. These starters arrived at our workshop facility in various states of repair, we have subsequently undertaken a full overhaul including repair and replacement of some parts and returned them to the client.      

3 08, 2016

6.6kV Electric Motor Overhaul

By |2017-10-18T14:53:50+01:00August 3rd, 2016|Electric Motors, Repair / Overhaul, Site Services|0 Comments

LS Engineering Services site support team recently completed the overhaul of 2 x 6.6kV Gas Compressor Motors for a major power & utility company in Bristol. Our initial scope of work was increased to include a partial stator re-wedge after our boroscope inspection found loose and missing wedges on one of the motors.