Control & Distribution

4 05, 2020

Routine Maintenance

By |2021-05-14T20:15:26+01:00May 4th, 2020|Control & Distribution, LV Switchgear, MV Switchgear, Oil & Gas, Site Services, Uncategorised|0 Comments

The importance of routine maintenance is clear to see in this photograph. A stalled motor caused an overload fault which was not cleared by the respective protection device. Subsequent investigation attributed complete failure of the motor and associated MCC cubicle to a failed motor overload device thus causing severe overheating and subsequent fire. The clients [...]

5 03, 2020

Completion of second Major LV Switchgear Contract for the UK Defence Sector

By |2020-03-05T16:16:20+00:00March 5th, 2020|Control & Distribution, Defence, LV Switchgear, Manufacture, Site Services|0 Comments

LS Engineering Services are pleased to announce the successful completion of another ‘intelligent’ switchboard for the UK Defence sector. This 440VAC 2000A switchboard has been manufactured at our site in Norwich in conjunction with Proeon Systems Following stringent in-house testing the switchboard has now been installed and tested at our clients facility in the north [...]

16 11, 2018

Beryl Bravo Platform – LV Modifications & Switchboard Maintenance

By |2019-04-23T16:16:32+01:00November 16th, 2018|Control & Distribution, LV Switchgear, MV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services Ltd have recently undertaken work on the Apache Beryl Bravo platform as part of the installations Delta V control system upgrade. This work involved the installation of control components and associated wiring modifications to a large quantity of LV MCC and MV cubicles to enable the platform remote operation of various drives. [...]

19 09, 2018

Delta Fire – Helideck Foam System CompEX electrical system

By |2019-04-23T16:09:09+01:00September 19th, 2018|Control & Distribution, Oil & Gas|0 Comments

LS Engineering Services Ltd have been working on a number of projects for Delta Fire , the most recent of which involved the procurement, installation, inspection and testing of a complete electrical system for a Heli Deck foam system container. The installation was required to be CompEX certified and therfore our Compex certified engineer was utilised. LS [...]

28 08, 2018

North Cormorant Platform – LV ACB retrofits & Power monitoring

By |2019-04-04T16:02:47+01:00August 28th, 2018|Control & Distribution, LV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services have recently completed the retrofit installation and commissioning of 13 Teresaki ACB's on the North Cormorant Platform. LS Engineering Services initially carried out a detailed site survey of the exisiting Merlin Gerin ACB's and then worked closely with Teresaki to engineer a retrofit solution. The installation work included removing the exisiting ACB's [...]

8 06, 2018

Major LV Switchgear Contract for the Defence Sector

By |2018-08-28T14:25:15+01:00June 8th, 2018|Control & Distribution, Defence, LV Switchgear, Manufacture|0 Comments

LS Engineering Services Ltd are pleased to announce that they have recently received the purchase order for a large LV switchboard for the Defence Sector. This switchboard will incorporate ABB's 'smart' range of switchgear products. Manufacture will commence late 2018 for delivery and site installation in 2019.

10 06, 2017

Fabcon Food Systems – Kuwait snack food production line control system

By |2017-10-18T14:30:24+01:00June 10th, 2017|Control & Distribution, Food, Manufacture, Site Services|0 Comments

LS Engineering Services recently completed the design, manufacture, test, installation and commissioning of a new control system for Fabcon Food Systems on behalf of a Kuwaiti snack food manufacturer. The new equipment includes a centralised control panel complete with local control points and is part of a large newly developed manufacturing line. LS Engineering Services have provided onsite [...]

24 04, 2017

Fabcon Food Systems – Snack food production line control system

By |2017-10-18T14:30:21+01:00April 24th, 2017|Control & Distribution, Food, Site Services|0 Comments

LS Engineering Services recently completed the design, manufacture, test, installation and commissioning of a new control system for Fabcon Food Systems on behalf of a nationwide snack food manufacturer. The new equipment includes a new centralised control panel complete with local control points and is part of a major extension to the original manufacturing line. LS Engineering [...]

30 01, 2016

Seafox 4 – 90kVA Transformer Panels

By |2017-10-18T14:55:26+01:00January 30th, 2016|Control & Distribution, Manufacture, Oil & Gas, Site Services|0 Comments

LS Engineering Services Ltd recently completed the design, build, test and commissioning of 2 90kVA transformer panels for the Seafox 4 platform These 125A Delta/Star transformer panels have been installed on the Seafox 4 jack-up accommodation barge and will provide hook up power between the barge and supported platform.

4 06, 2015

Pro Watch Gate Controller

By |2017-10-18T16:10:43+01:00June 4th, 2015|Control & Distribution, Manufacture, Oil & Gas|0 Comments

LS Engineering Services recently completed the design and manufacture of a number of gate controllers for an Oil and Gas major. This project involved the installation of PSU's and Pro-watch unit's within various electrical enclosures for the control of access gates.    

This website uses cookies and third party services. Ok