slendaur

12 07, 2020

Laurence Scott SlendaurTM refurbishment

By |2020-07-28T11:09:18+01:00July 12th, 2020|Food, Manufacture, MV Switchgear|0 Comments

Our workshop are busy preparing 3 x Laurence Scott Slendaur TM DOL starters for despatch back to our clients facility in Gloucestershire UK. These starters have undergone a full refurbishment including new Toshiba Corporation contactors, PBSI Group Ltd protection relays, Cooper Bussmann Inc main HV fuses and full component replacement and re-wire. LS Engineering Services Ltd specialise in retrofit and refurbishment solutions [...]

24 01, 2020

Perenco – MV Switchgear upgrade modification

By |2020-01-24T13:23:39+00:00January 24th, 2020|Manufacture, MV Switchgear, Oil & Gas, Repair / Overhaul|0 Comments

LS Engineering Services Ltd have just completed upgrade modification work to a Laurence Scott Slendaur TM truck. The truck was received as a 550KW 3.3kV DOL motor starter with the customer requesting modification of the drive into a Feeder for a 1MVA 3.3kV Transformer. This workscope therefore involved the supply and installation of uprated cabling, [...]

20 09, 2019

Extensive range of spare parts – Laurence Scott

By |2019-09-23T09:49:09+01:00September 20th, 2019|LS News, LV Switchgear, MV Switchgear, Repair / Overhaul|0 Comments

Here at LS Engineering Services Ltd we hold an extensive range of spare parts for the Laurence Scott ranges of switchgear including CentaurTM and Slendaur TM Where spares are obsolete we have the expertise and knowledge to recommend and advise on suitable retrofit replacements. View our range of spares  

20 08, 2019

CLH Pipeline Systems – New Contract

By |2019-09-23T09:46:21+01:00August 20th, 2019|LS News|0 Comments

LS Engineering Services have just won their first contract with CLH Pipeline Group, a company that specialise in the storage and transport of hydrocarbons across the UK. We are currently tendering for a number of workscopes with CLH Pipeline Group and hope this is the beginning of a long and succesful partnership.

7 05, 2018

Laurence Scott & Electromotors Ltd Slendaur Upgrade – Singapore

By |2018-08-28T14:14:23+01:00May 7th, 2018|MV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services Ltd recently completed upgrade and maintenance work to two Laurence Scott & Electromotors Ltd Slendaur MV Motor starters for our client in Singapore. This work involved the replacement of two vacuum contactor's, fitting of replacement CT's and partial re-wire of the control circuit. The work was undertaken within the clients local workshop [...]

18 02, 2018

MV Switchgear – Transducer Retrofit

By |2018-05-01T15:23:49+01:00February 18th, 2018|MV Switchgear, Oil & Gas, Site Services|0 Comments

LS Engineering Services recently completed the installation and commissioning of a number of current monitoring transducer kits at 5 different sites for the UK's leading provider of engineering and operational services to the onshore oil and gas pipeline sector. This project included the design, installation and commissioning of each kit and were installed in careful [...]

6 08, 2017

MPR3000 retrofit

By |2017-10-18T14:51:30+01:00August 6th, 2017|Food, Manufacture, MV Switchgear, Site Services|0 Comments

LS Engineering Services recently completed the retrofit of 5xP&B MPR3000 motor protection relays at a rape seed oil refinery in the UK. The current electro-mechanical P&B Mn5e motor protection relays were found to not give a quick enough response during production anomalies thus causing production disruption. LS Engineering Services engineered a solution in the form [...]

13 02, 2017

Ambergate WTW – Laurence Scott Slendaur Energy meter installation

By |2017-10-18T14:31:41+01:00February 13th, 2017|LV Switchgear, Manufacture, Power & Utilities, Site Services|0 Comments

LS Engineering Services Ltd recently completed the installation of Energy measurement metering on a number of 3.3kV Laurence Scott Slendaur units at Ambergate WTW. This project included the installation of Socomec Diris A40 multi function meters along with new metering CT's, VT's and associated analogue and digital signal cabling.

5 03, 2016

Laurence Scott Slendaur uprate

By |2017-10-18T14:46:52+01:00March 5th, 2016|Food, Manufacture, MV Switchgear, Site Services|0 Comments

LS Engineering Services Ltd recently completed uprate work on two Laurence Scott Slendaur HV starters. This work required uprating the starters from 225kW to 450kW and included the replacement of overload CT’s, metering CT’s, mains cabling and ammeter.