Control System Upgrade & Switchgear Modernisation

Case Study

Control System Upgrade & Switchgear Modernisation
Air Products – Botlek, Netherlands

We delivered a comprehensive modernisation programme for Air Products’ on one of their GEC HMC1172 medium voltage switchboards, combining advanced protection technology with engineered retrofit solutions and on site commissioning

Project Highlights
  • Upgraded multiple feeders and DOL panels with new SEL protection relays (SEL‑751A & SEL‑710)
  • Redesigned legacy control circuits, reducing component count and improving long‑term reliability
  • Manufactured bespoke pre‑wired doors and backplates for seamless installation
  • Converted a DOL panel to a 2000 kVA Tx feeder circuit, including conversion of earth switching method from automatic to manual, and addition of mechanical latch and shunt trip coil.
  • Performed full switchgear maintenance on VCB and six vacuum contactor circuits across nine panels
  • Completed main busbar inspections to verify system integrity
  • All works were delivered through a mix of factory‑built retrofit kits and on‑site installation, testing, and commissioning at the active facility.
Client Benefits
  • Modern, high‑accuracy protection across critical assets
  • Reduced downtime and improved operational safety
  • Extended equipment life through OEM‑aligned maintenance
  • Streamlined control philosophy and simplified future servicing
  • Fast, low‑disruption installation thanks to engineered retrofit kits